ATA was selected by a new client to build a turn-key Oil Pump ECT system to benchmark the performance of existing and future pump models. The client was a premier international manufacturer of powertrain automotive components.
Read MoreManufacturers constantly need to modify products to incorporate advancements in technology and improvements in design and efficiency. With the push for electrification and improvements in efficiency of components, water pumps have seen significant advancements.
Read MoreAfter production and before products go into field usage, it is necessary to conduct complete end-of-line performance testing. In the case of their advanced dual-head fuel injectors, our client recognized the need to fully evaluate all production components within their injectors, and to subject these components to rigorous test conditions.
Read MoreWhether developing a new hydraulic pump design that has to closely match predefined specifications, or verifying the functionality of a production unit, an accurate and reliable test system is needed to confirm the functional parameters of those pumps.
Read More